News

Tamil Nadu Sanctions Rs.74.3 Billion for Roads, Bridges

Tamil Nadu Sanctions Rs.74.3 Billion for Roads, Bridges

G.O.s passed for major road and bridge projects statewide

Rs 80 Million Road Inaugurated to Connect 20 Tribal Villages

Rs 80 Million Road Inaugurated to Connect 20 Tribal Villages

New 8-km road ends Doli dependence in Andhra tribal belt

Road Repair Works Begin in Delhi’s Rohini Sector 20

Road Repair Works Begin in Delhi’s Rohini Sector 20

Minister Indraj launches initiative to fix broken internal roads

Thiruvananthapuram ORR Land Costs Surge to Rs 38 Billion

Thiruvananthapuram ORR Land Costs Surge to Rs 38 Billion

Delays may push land cost for ring road project even higher

Tata Steel to Launch Modular Bridges in India with InQuik

Tata Steel to Launch Modular Bridges in India with InQuik

New tech promises faster, durable bridges in remote regions

Mumbai’s Seaside Promenade Phase 1 Opens on 15 July

Mumbai’s Seaside Promenade Phase 1 Opens on 15 July

Coastal walkway to boost green public spaces in the city

Burdwan Road Flyover to Open by August Ahead of Durga Puja

Burdwan Road Flyover to Open by August Ahead of Durga Puja

Flyover aims to ease Siliguri traffic before festival rush

U.P. Clears Rs 47.75 Billion Agra-Purvanchal Link Expressway

U.P. Clears Rs 47.75 Billion Agra-Purvanchal Link Expressway

New 50-km link to bridge key expressway corridors in U.P.

Toll Taken But Works Unfinished on Kerala’s 6-Lane NH Stretch

Toll Taken But Works Unfinished on Kerala’s 6-Lane NH Stretch

Toll began 3 years ago, yet vital safety and service works remain..

Elevated Road to Link Parel and Haji Ali Proposed

Elevated Road to Link Parel and Haji Ali Proposed

Rs 3 billion viaduct aims to cut Mumbai travel time by 30 mins

NHAI to Monetise 550 km Highways via InvIT This Year

NHAI to Monetise 550 km Highways via InvIT This Year

NHIT’s fifth InvIT round to raise Rs 125 billion in FY25

Prestige to Build Rs 2 Billion Flyover in Bengaluru Tech Hub

Prestige to Build Rs 2 Billion Flyover in Bengaluru Tech Hub

Prestige gets BBMP nod for 1.5-km flyover near ORR in Bellandur

12 Dead After Bridge Collapses in Gujarat's Vadodara

12 Dead After Bridge Collapses in Gujarat's Vadodara

43-year-old bridge collapse sends vehicles into Mahisagar River

ANPR Cameras to Curb Speeding on Salem Highways

ANPR Cameras to Curb Speeding on Salem Highways

Rs 1 million project targets accident-prone junctions

Govt Cuts Toll by Up to 50 per cent on Flyovers, Tunnels

Govt Cuts Toll by Up to 50 per cent on Flyovers, Tunnels

New formula lowers tolls for highways with key structures

Pune-Bengaluru Expressway Awaits Centre’s Final Nod

Pune-Bengaluru Expressway Awaits Centre’s Final Nod

Rs 500 billion project to cut travel time by half is on hold

UP Plans Rs 11.11 Billion Road And Bridge Projects

UP Plans Rs 11.11 Billion Road And Bridge Projects

Ten ROBs and RUBs to be built under Rs 11.11 billion plan.

PMRDA Clears Encroachments To Reopen Hinjewadi–Marunji Road

PMRDA Clears Encroachments To Reopen Hinjewadi–Marunji Road

Road reopening to ease Hinjewadi traffic within three weeks

Delhi–Jaipur Expressway To Cut Journey To 3 Hours

Delhi–Jaipur Expressway To Cut Journey To 3 Hours

Rs?20?billion expressway will speed Delhi–Jaipur trips and ease..

PWD Plans Rs?7.2?Million Audit of Four South Delhi Flyovers

PWD Plans Rs?7.2?Million Audit of Four South Delhi Flyovers

Audit, repairs set for key Delhi flyovers by early 2026

Punjab To Spend Rs?35?Billion On Rural Road Repairs

Punjab To Spend Rs?35?Billion On Rural Road Repairs

State plans to fix 19,000?km of link roads, eyes broader upgrades

Gadkari Reveals Mobility Plan for Hyperloop, E-Buses, and Ropeways

Gadkari Reveals Mobility Plan for Hyperloop, E-Buses, and Ropeways

The transport sector currently contributes around 40 per cent to..

Nitin Gadkari Inaugurates Rs 5.58 Bn Ratu Road Elevated Corridor

Nitin Gadkari Inaugurates Rs 5.58 Bn Ratu Road Elevated Corridor

Union Minister launches corridor, lays foundation for Rs 38 bn NH..

Final Forest Clearance Secured for Goregaon Mulund Link Road Tunnels

Final Forest Clearance Secured for Goregaon Mulund Link Road Tunnels

MOEFCC approves diversion of 19.43 hectares in SGNP for GMLR..

Nagpur’s Rs 2.6 Billion Phase-IV Cement Road Project Faces Delays

Nagpur’s Rs 2.6 Billion Phase-IV Cement Road Project Faces Delays

NMC extends deadlines after missing May target for Phase-IV road..

STRR Expressway to Boost Bengaluru’s Connectivity and Real Estate

STRR Expressway to Boost Bengaluru’s Connectivity and Real Estate

The 288 km STRR project will ease traffic and raise land values..

Gadkari Unveils Green Mobility Plan With New Tech, Faster Roads

Gadkari Unveils Green Mobility Plan With New Tech, Faster Roads

Plan includes ropeways, hyperloop, flex-fuel cars, e-buses

Govt Halves Tolls on Tunnel and Flyover Highway Sections

Govt Halves Tolls on Tunnel and Flyover Highway Sections

New formula cuts commercial vehicle charges by up to 50?per?cent

NHAI Suspends Officials Over Pavement Damage on NH-754K in Gujarat

NHAI Suspends Officials Over Pavement Damage on NH-754K in Gujarat

Contractor, engineer and NHAI official penalised for defective work

UP?Plans?Rs?10,000?Bn?Expressway?Logistics?Clusters

UP?Plans?Rs?10,000?Bn?Expressway?Logistics?Clusters

Six?100 hectare hubs to anchor manufacturing along UP expressways

L&T Sets Tunnel Boring World Record on Rishikesh–Karnaprayag Rail

L&T Sets Tunnel Boring World Record on Rishikesh–Karnaprayag Rail

TBM ‘Shiv’ drills 790?m in 31?days, beating global record

Environment Ministry Clears Stage I Nod for Coastal Road Phase II

Environment Ministry Clears Stage I Nod for Coastal Road Phase II

The BMC has already obtained environmental clearances and No..

BMC to Receive 19.43 Hectares of Forest Land

BMC to Receive 19.43 Hectares of Forest Land

The twin tunnels will be built at depths ranging from 20 to 160..

L&T Sets World Record in Tunnel Work on Rishikesh-Karanprayag Rail LinK

L&T Sets World Record in Tunnel Work on Rishikesh-Karanprayag Rail LinK

The first TBM, named 'Shakti', completed 10.47 km of the upline..

Assembly begins for ‘Nayak’ TBM on Thane– Borivali Twin Tunnel Project

Assembly begins for ‘Nayak’ TBM on Thane– Borivali Twin Tunnel Project

Assembly Begins for ‘Nayak’ TBM on Thane-Borivali Tunnel Project

Maharashtra approves Rs.207.87 billion for Shaktipeeth expressway

Maharashtra approves Rs.207.87 billion for Shaktipeeth expressway

Maharashtra Approves ?20,787 Cr for Shaktipeeth Expressway Project

Centre approves  Rs.106.37-billion road and tunnel projects for J&K

Centre approves Rs.106.37-billion road and tunnel projects for J&K

296-km network to enhance all-weather connectivity in border areas.

NHAI launches strategy to monetise national highway assets

NHAI launches strategy to monetise national highway assets

The National Highways Authority of India (NHAI) has announced its..

Sikkim Seeks Double Lane Link to Siliguri

Sikkim Seeks Double Lane Link to Siliguri

CM Tamang urges NHIDCL to plan all weather upgrade.

Centre Clears Rs?36.67?Bn Road Plan for Himachal

Centre Clears Rs?36.67?Bn Road Plan for Himachal

Rs?36.67?bn approved for highways; tunnel and bridge funds secured.

GDA Drafts Rs?1.93?Billion Plan to Extend Hindon Elevated Road

GDA Drafts Rs?1.93?Billion Plan to Extend Hindon Elevated Road

Two new ramps will link Vasundhara and Indirapuram to the flyover.

PMC Drafts DPR For Three Key Wagholi Roads

PMC Drafts DPR For Three Key Wagholi Roads

Plan targets congestion relief on busy Nagar Road

Tamil Nadu Approves Rs 8,000 Crore For Rural Road Upgrade

Tamil Nadu Approves Rs 8,000 Crore For Rural Road Upgrade

20,000 km to be developed under rural connectivity scheme

Assam Builds Emergency Airstrip for IAF on NH-2

Assam Builds Emergency Airstrip for IAF on NH-2

4.2-km ELF in Moran to support air ops during crises.

Toll Collection to Start Soon on 70 Km Stretch of Bengaluru-Chennai E-way

Toll Collection to Start Soon on 70 Km Stretch of Bengaluru-Chennai E-way

Currently, around 2,000 to 2,500 vehicles use the Karnataka section..

BMC Drops Rs 13.29 Bn Elevated Road Plan Due to MMRDA Tunnel Clash

BMC Drops Rs 13.29 Bn Elevated Road Plan Due to MMRDA Tunnel Clash

The project has now been shelved due to overlapping alignment with..

NHAI Constructs India's First Animal Overpass on Delhi-Mumbai E-way

NHAI Constructs India's First Animal Overpass on Delhi-Mumbai E-way

The project also incorporated numerous eco-friendly practices.

Chennai To Rebuild Kodungaiyur Canal Bridge Before Monsoon

Chennai To Rebuild Kodungaiyur Canal Bridge Before Monsoon

Rs 2.5 crore project aims to spare Kodungaiyur from floods

Tamil?Nadu Clears Rs?80?Billion Plan To Upgrade 20,000?km Rural Roads

Tamil?Nadu Clears Rs?80?Billion Plan To Upgrade 20,000?km Rural Roads

Scheme covers 20,000?km of roads and two lakh new homes

Cabinet OKs Rs?18.5?Bn Four Lane NH 87 in Tamil?Nadu

Cabinet OKs Rs?18.5?Bn Four Lane NH 87 in Tamil?Nadu

46.7 km Paramakudi–Ramanathapuram stretch to be widened

Heavy Rains Delay Opening of Kusmalli Bridge

Heavy Rains Delay Opening of Kusmalli Bridge

Backfilling work waits for dry spell on Belagavi–Goa route

BBMP Turns to Stone Matrix Asphalt for Flyover Upgrades

BBMP Turns to Stone Matrix Asphalt for Flyover Upgrades

Durable SMA to keep Bengaluru flyovers pothole free longer

MMRDA Cuts Cost of Uttan-Virar Coastal Road by Rs 340 Billion

MMRDA Cuts Cost of Uttan-Virar Coastal Road by Rs 340 Billion

Revised 55-km road plan slashes cost to Rs 52.7 billion with lean..

Cabinet Clears Rs 1,853 Cr Four-Lane Highway in Tamil Nadu

Cabinet Clears Rs 1,853 Cr Four-Lane Highway in Tamil Nadu

Paramakudi-Ramanathapuram stretch to be widened to 4 lanes

India’s Maha Kumbh of Road Construction

India’s Maha Kumbh of Road Construction

RAHSTA Forum 2025 gathered industry leaders to drive tech-led,..

Work on Chennai’s First Cable-Stayed Bridge Set to Begin Soon

Work on Chennai’s First Cable-Stayed Bridge Set to Begin Soon

Two additional cable-stayed bridges will also be constructed along..

FASTag Annual Pass May Cut Toll Operators’ Revenue by 4–8%

FASTag Annual Pass May Cut Toll Operators’ Revenue by 4–8%

The compensation process will involve consultation with..

MoRTH to Frame IRC Norms for New-Age Machines in Highway Work

MoRTH to Frame IRC Norms for New-Age Machines in Highway Work

The ministry has also sought feedback on adoption of AIMC

Vikaspuri Road Upgrade, Tree Drive to Boost Delhi Constituency

Vikaspuri Road Upgrade, Tree Drive to Boost Delhi Constituency

Minister Launches New Road And Tree Drive To Aid Vikaspuri's Growth

Sharavathi Cable-Stayed Bridge Clears Load Test

Sharavathi Cable-Stayed Bridge Clears Load Test

Deflection well within limit; opening slated post-monsoon.

Nitish Kumar Opens Rs 49.88 Bn Kacchi Dargah Ganga Bridge

Nitish Kumar Opens Rs 49.88 Bn Kacchi Dargah Ganga Bridge

Six-lane cable-stayed link boosts north–south travel in Bihar.

Bommai Flags Off Rs 4.8 Bn Gajendragad Bypass Project

Bommai Flags Off Rs 4.8 Bn Gajendragad Bypass Project

New NH-367 works promise stronger links across North Karnataka

Centre Clears Upgrade Of Srinagar–Qazigund Alternative Highway

Centre Clears Upgrade Of Srinagar–Qazigund Alternative Highway

Rs 0.95 bn Qazigund bypass unlocks work on 63 km NH-444 link

Bengaluru Clears Rs 420 Bn Silk Board–Hebbal Tunnel Plan

Bengaluru Clears Rs 420 Bn Silk Board–Hebbal Tunnel Plan

16.7 km tolled tunnel to cut city traffic; tenders out shortly

Delhi–Jaipur Drive to Shrink by One Hour

Delhi–Jaipur Drive to Shrink by One Hour

Bandikui–Jaipur spur opens in July, cutting route length and time

Maharashtra Clears Rs 208 Bn Shaktipeeth Expressway Land

Maharashtra Clears Rs 208 Bn Shaktipeeth Expressway Land

Cabinet okays Rs 208 billion route from Vidarbha to Konkan

Centre Clears Rs 106 Bn J&K Road, Tunnel Push

Centre Clears Rs 106 Bn J&K Road, Tunnel Push

Nineteen projects will deliver all-weather links across J&K

Reliance Infra Clears Rs 2.73 Bn Debt for JR Toll Road

Reliance Infra Clears Rs 2.73 Bn Debt for JR Toll Road

Full loan settlement with Yes Bank ends guarantee obligations

Work Begins On Baprola–Harphool Vihar Road After Long Delay

Work Begins On Baprola–Harphool Vihar Road After Long Delay

Revamp Will Ease Commutes For Pupils And Residents In Vikaspuri

New Roads And Water Works Progress In Madurai North

New Roads And Water Works Progress In Madurai North

Rs 12 Million Allocated For Road Laying In Two Localities

Reliance Infra Settles Rs 2.73 Billion Yes Bank Loan

Reliance Infra Settles Rs 2.73 Billion Yes Bank Loan

Debt Clear-Out Ends Guarantee For JR Toll Road

Maharashtra Allocates Rs 170 Billion For Key Land Acquisitions

Maharashtra Allocates Rs 170 Billion For Key Land Acquisitions

Funds Target Nine Priority Road And Corridor Projects State-Wide

NHAI Steps Up Flood Readiness On National Highways

NHAI Steps Up Flood Readiness On National Highways

15-Day Drive Targets Waterlogging Ahead Of Monsoon

Bihar to Upgrade 526 Rural Roads by March 2026

Bihar to Upgrade 526 Rural Roads by March 2026

Rs 8 Billion Project to Boost Connectivity in Muzaffarpur

25 Pune Bridges Found Needing Urgent Repairs

25 Pune Bridges Found Needing Urgent Repairs

Audit flags safety concerns; major works pending fund allocation

Lucknow to Get First Grid Road System in IT City Project

Lucknow to Get First Grid Road System in IT City Project

LDA to begin grid road construction in July across 2,858-acre site

GMDA Plans Rs 390 Million Road Link to NH-48

GMDA Plans Rs 390 Million Road Link to NH-48

2.3-km road to boost access for key Gurugram sectors

Ashoka Buildcon Secures Rs 5.62 Billion Guyana Road Contract

Ashoka Buildcon Secures Rs 5.62 Billion Guyana Road Contract

Firm to build Phase 2 of key East Bank–East Coast linkage

Robust Road Network Key to Viksit Bharat: Malhotra

Robust Road Network Key to Viksit Bharat: Malhotra

Minister highlights socio-economic gains of road infrastructure

Landslide Halts Rs 250 Million Road Project in Odisha

Landslide Halts Rs 250 Million Road Project in Odisha

Heavy rain triggers embankment collapse near Kalinga Ghat

Virar-Alibaug Corridor to Use BOT Model in Phase 1

Virar-Alibaug Corridor to Use BOT Model in Phase 1

Rs 370.13 billion allocated for first phase of key road project

Ranchi Flyover Inauguration Delayed to 3 July

Ranchi Flyover Inauguration Delayed to 3 July

Rs 2.91 billion flyover project awaits naming consensus

GMDA Plans Rs 390 Million Road to Link NH-48 With Sectors 78–80

GMDA Plans Rs 390 Million Road to Link NH-48 With Sectors 78–80

Key 2.3 km stretch to ease traffic, improve regional access

Lucknow’s First Grid Road System Set to Begin in July

Lucknow’s First Grid Road System Set to Begin in July

LDA to launch grid roads for 2,858-acre IT City project

Download Brochure
Brochure Post Show Report