Funds include roads, Yamuna cleaning and centrally sponsored schemes
Funds include roads, Yamuna cleaning and centrally sponsored schemes
37-km extension approved to cut travel time to 30–45 minutes
Road construction to start within three to four days
Approvals speed up roads telecom and water access in tribal hamlets
Project needs diversion of more than 103 hectares of forest
Higher bitumen prices delay repairs on key city roads
Elevated rotary aims to ease congestion near Sir M Visvesvaraya..
Independent Engineer Role for Kurali Kiratpur Four-Laning
Settlement under Vivad se Vishwas III for Agra bypass project
A primer on the route, design and strategic benefits
Four Lanes And Tunnels To Improve Safety And Connectivity
Commission directs mechanised sweeping and strict enforcement
Multi-tracking and bypass to reduce congestion and improve mobility
Four-lane elevated road sinks again; area barricaded for safety
Two-lane structure to boost connectivity in Taramandal
Project Funded At Rs One Point Three Billion
High-level committee to propose integrated traffic solutions
Approvals include Rs17,630.8 mn for rural roads and Rs20,550 mn for..
Union committee approves diversion of 34.88 hectares for highway..
Capital spending reaches Rs 10.75 trillion led by rail and highways
MLA reports efforts under way on Bandipora tunnel
Recognition for using end-of-life plastic in road infrastructure
Ryans Road Project Approved Under Fast-Track Consenting
The masterclass brings together industry experts, engineers and..
Ministry directs transfer as NHIDCL manages most new highways
Modular system used for Avinashi Road crash barrier construction
MoUs span hospitality, logistics, agro-processing and civic..
MoUs span hospitality, logistics, agro-processing and civic..
Cable-stayed structure recognised for engineering innovation
Route to improve connectivity between Mumbai, Pune and Marathwada
Project set to raise property values by 12–15 per cent
NHAI ends three packages, Rs 2,650 million settlement
Authority considers arterial road designation and betterment levy
Barrier-less tolling begins on NH-48 in Gujarat
Roundtable discussions focus on innovation for safer highways.
PMC appoints expert and allocates Rs 340 million for planning
NHAI clears Barabanki Bahraich NH-927; forest approval pending
Authorities plan toll as upgrade reaches final stages
New 825-metre four-lane bridge to ease congestion on highway
594 km greenfield expressway to improve links and industry
Review covers 18,462 km in Maharashtra and 288 km in Goa
Fadnavis hails Navayuga’s widest tunnel engineering feat
India-first system installed to enhance highway safety
594 km greenfield corridor links western to eastern Uttar Pradesh
Projects to connect hundreds of habitations and boost last?mile..
Authority issues safety guidelines for construction and toll staff
Maharashtra’s most ambitious greenfield bypass — a 13.3-km..
New expressway stretch cuts travel time, lifts property outlook
594 km greenfield expressway to improve links and industry
Company says rural road push will boost access and livelihoods.
Key insights on quality, safety and sustainability from the RAHSTA..
Moving from kilometres to capital intelligence, LT GEN RAJEEV..
New bridge to boost link between Cuttack and Bhubaneswar
Domestic one year order for Vembukudi fee plaza in Tamil Nadu
New bridge to link Cuttack and Bhubaneswar and ease congestion
DPR complete for six phases as planning proceeds
12-kilometre four-lane bypass to improve regional connectivity
HSR Layout–Jayanagar link allows vehicles during trial
Infrastructure works announced for Dudhli in Kasumpti
Byculla to CSMT travel time cut to 10 minutes
Partial opening connects Wyra to Ponguturu over 116 km
State Approval And New Funds Set Stage For Faster Work
Inspection finds 34 visible road dust violations across three zones
12 km greenfield four-lane bypass to link Delhi-Dehradun corridor
BMC reduces pothole spending as road upgrades near completion
Flags NOC Delays In Border Areas And Orders Faster Clearances
NHAI to open second four-lane bridge at Warje, easing congestion
Work on the eight point three kilometre (km) stretch will improve..
Package includes highways, ring road and elevated corridors
Shares rise after firm becomes L1 bidder for NHAI contracts
PWD says projects will ease congestion and improve traffic flow
Meeting with Union minister advances connectivity priorities
Chief minister inaugurates upgraded hospital and new road
Redevelopment to reshape transport and utilities in the hub
Subsidiary set up for Rs 15.8211 billion (bn) Odisha ring road
Extension aims to accelerate rural road upgrades and access
Projects cover 2,400 km to connect 781 villages
MoRTH deploys TMAs to protect workers and motorists
Projects to Bolster Connectivity and Access to Services
Redevelopment to reshape transport and utilities in the hub
Subsidiary set up for Rs 15.8211 billion (bn) Odisha ring road
Extension aims to accelerate rural road upgrades and access
Projects cover 2,400 km to connect 781 villages
Integrated corridor project aims to ease congestion across 34 km